RW Services + Frontier Man Beard Company

Boker Magnum Long Lead EDC Slipjoint Folder

Sale price Price $54.00 Regular price $59.00 Unit price  per 

Shipping calculated at checkout.

G10, Black. B-01SC080

The Magnum Long Lead EDC is a classic gentleman’s and gourmet pocket knife for everyday use. It’s simple, slightly curved design is instantly appealing. The no-frills design also corresponds to it’s technical construction as a slip-joint knife, which has proven itself a million times over thanks to it’s ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. 

Overall length 7.24”

Blade length  3.15”